Description
Successful Complete Project
The installation of the Krones Can Line (Thermofeeder Bloc) at Pepsi in Iraq was successfully completed in 2019. This high-capacity project introduced cutting-edge technology, delivering an impressive production rate of 78,000 cans per hour to meet the increasing demand for Pepsi products in the region.
- Ultra-high-speed canning line capable of producing 78,000 cans per hour.
- Integration of the advanced Thermofeeder Bloc for enhanced efficiency.
- Meets international standards for performance, hygiene, and safety.
Problem
The previous canning setup struggled to meet the soaring consumer demand due to limitations in speed and reliability. Frequent downtimes and outdated technology created bottlenecks in production and impacted operational efficiency.
Solution
To overcome these challenges, a state-of-the-art Krones Can Line with the Thermofeeder Bloc was installed. This solution delivered unmatched speed, precision, and reliability, ensuring Pepsi could achieve production targets while maintaining product quality.
Process
The installation process was meticulously planned and executed in the following phases:
- Comprehensive analysis of the existing infrastructure and production goals.
- Design and customization of the Krones system with the Thermofeeder Bloc.
- Seamless installation and integration into the production line.
- Thorough testing and commissioning to guarantee optimal performance.
This project not only enhanced Pepsi’s operational capabilities in Iraq but also positioned the facility as a benchmark for modern beverage production in the region.