Aquafina, Relocation, PET line, 45,000 b/h ,Krones, Lebanon – 2022
In 2022, we successfully transferred the Aquafina production line in Lebanon. This complex project involved a meticulous relocation and reinstallation process, ensuring minimal downtime and maintaining strict standards for operational efficiency, safety, and quality. By carefully planning and executing each stage of the transfer, we enabled Aquafina to continue its production seamlessly while optimizing their operations in Lebanon.
Arwa, Installation, Can Line Krones, 40000c/h, Setif, Algeria – 2019
Arwa’s Setif facility upgraded its production capabilities in 2019 with a Krones Can Line. This high-speed system, capable of processing 40,000 cans per hour, addressed the limitations of the older line, including frequent breakdowns and slow production rates. By implementing this advanced technology, Arwa significantly improved its production efficiency and capacity.
PEPSI, Installation, Can Line Krones,(Thermofeeder bloc)78000c/h, IRaq – 2019
Pepsi’s Iraq facility upgraded its production capabilities in 2019 with a Krones Can Line. This high-speed system, equipped with the Thermofeeder Bloc, significantly boosted efficiency and output, meeting the increasing demand for Pepsi products in the region.
Beraseri, Installation can line Krones , Congo – 2018
Beraseri, Congo, revolutionized its beverage production in 2018 with the installation of a Krones Can Line. This state-of-the-art technology addressed the limitations of outdated equipment and operational inefficiencies, enabling high-speed, reliable operations and superior product quality. By meeting the growing market demands, Beraseri solidified its position as a leader in the Congolese beverage industry.
Manbaa, Installation can line Krones, 28000c/h, Biskra, Algeria – 2018
In 2018, the Manbaa facility in Biskra, Algeria, embarked on a production revolution. The installation of a state-of-the-art Krones Can Line marked a pivotal moment, empowering the facility to meet surging market demands. This high-speed system, capable of processing 28,000 cans per hour, significantly streamlined operations and enhanced product quality. By addressing the limitations of the existing infrastructure, including outdated equipment and operational inefficiencies, the facility achieved unprecedented levels of efficiency and productivity.
NCA, Installation can line Krones, 32000 c/h, Rouiba, Algeria – 2018
NCA’s Rouiba facility in Algeria significantly enhanced its production capabilities in 2018 through the successful installation of a Krones Can Line. This high-performance system, capable of processing 32,000 cans per hour, boosted operational efficiency and output. By addressing the limitations of the existing infrastructure, including outdated systems and insufficient capacity, the factory streamlined operations, reduced downtime, and improved product quality.
Beraseri, Installation Can line Krones, Burkina Faso – 2017
The Beraseri facility in Burkina Faso underwent a significant upgrade in 2017 with the successful installation of a Krones Can Line. This advanced production line, designed to meet the growing demand for quality beverages, offers optimized performance, seamless integration with factory operations, and adherence to international safety and quality standards. By implementing this state-of-the-art Krones solution, the factory addressed its limitations in production capacity and efficiency, resulting in streamlined operations and improved product quality.
Ifri, Installation, Can line Krones, 4500c/h, Akbou Béjaia, Algeria – 2016
The Ifri facility in Akbou, Béjaia, Algeria, saw a significant upgrade in 2016 with the successful installation of a Krones Can Line. This modern production line, capable of producing 4,500 cans per hour, was designed to enhance efficiency and product quality in beverage manufacturing. By implementing this advanced Krones solution, the factory addressed its need for increased capacity and reliability.
Coca-Cola, Installation, Can Line Krones, 60000 c/h, Rouiba, Algeria – 2016
In 2016, we successfully completed the installation of the Krones Can Line at Coca-Cola in Rouiba, Algeria. This project delivered a state-of-the-art production line with a capacity of 60,000 cans per hour, significantly enhancing the factory’s operational efficiency and output quality. By implementing a cutting-edge Krones system, we addressed the factory’s need for increased production capacity and reliability.
PEPSI, Installation, Can line Krones, 40000 c/h, Setif, Algeria – 2015
In 2015, we successfully completed the installation of the Krones Can Line at Pepsi in Setif, Algeria. This project aimed to establish a high-capacity production line capable of processing 40,000 cans per hour, ensuring efficiency and quality in beverage manufacturing. By implementing a state-of-the-art Krones system, we addressed the factory’s need for increased production capacity and reliability. This solution offered seamless integration with existing factory systems, improved overall efficiency, and enhanced product quality.