HAYAT, Installation, KHS LINE, 28000 B/H BISKRA, Algeria- 2025
In 2025, SAADA TECHNOLOGIE carried out the installation of a KHS bottling line with a capacity of 28,000 bottles per hour for SARL RAWI, the HAYAT brand in Biskra, Algeria.
ARWA, Supervision and LIFTING, PET SODA, KRONES LINE ERGOBLOC A L’ETAGE 24000BPH SETIF Algeria- 2025
In 2025, our team successfully supervised the installation and commissioning of a KRONES PET soda production line (Ergobloc) at the ARWA facility in Sétif, Algeria. Operating at a capacity of 24,000 bottles per hour (BPH), along with lifting and handling the equipment.
LA BELLE, INSTALLATION, CFT LINE, KHEMIS EL KHECHNA, ALGERIA – 2024
In 2024, SAADA TECHNOLOGIE carried out the installation of a CFT line for LA BELLE in Khemis El Khechna, Algeria. This line was used for the production of conserves products.
ARWA, INSTALLATION, PET LINE 5L, SMI LINE, SÉTIF, ALGERIA– 2023
In 2023, SAADA TECHNOLOGIE completed the installation of a 5L PET SMI line at the JUS LA BELLE company in Sétif, Algeria.
ARWA, Relocation, CAN line, 24,000 C/h Krones, Sétif, Algeria– 2022
In 2022, we successfully completed the relocation of a 24,000 C/h KRONES can line for ARWA in Sétif, Algeria. The project involved the full transfer and reinstallation of the line, carried out with strict adherence to safety, quality, and operational efficiency standards.
QNIAA, INSTALLATION, PET line and SYRUP ROOM, 24,000 B/h Krones, AKBOU BEJAIA, Algeria– 2019
In 2019, SAADA TECHNOLOGIE carried out the installation of a 24,000 B/h PET line from Krones at QNIAA in Akbou, Béjaïa, Algeria. The project also included the installation of the syrup room (mechanical work, electrical work, piping work).
N’GAOUS, RELOCATION, SIDEL PET LINE, KHEMIS EL KHECHNA, ALGERIA – 2018
In 2018, SAADA TECHNOLOGIE completed successully the relocation of a SIDEL PET line of N’Gaous brand in Khemis El Khechna, Algeria.
Arwa, Installation, Can Line Krones, 40000c/h, Setif, Algeria – 2019
The installation of the Krones Can Line at Arwa in Setif, Algeria, was completed in 2019. The canning line, capable of processing 40,000 cans per hour.
Manbaa, Installation can line Krones, 28000c/h, Biskra, Algeria – 2018
The installation of the Krones Can Line at Manbaa in Biskra, Algeria, was successfully completed in 2018. This project delivered a Krones production line with a capacity of 28,000 cans per hour.
NCA, Installation can line Krones, 32000 c/h, Rouiba, Algeria – 2018
The installation of the Krones Can Line at NCA in Rouiba, Algeria, was successfully completed in 2018. This project introduced a high-capacity production line with a speed of 32,000 cans per hour.