Description
Successful Complete Project
The installation of the Can Line Cosemi at Toudja, Béjaia, Algeria, was successfully completed in 2014. The project focused on achieving efficient production capacity of 12,000 cans per hour while ensuring adherence to modern standards of quality and performance in beverage packaging.
- High-speed canning line capable of handling 12,000 cans per hour.
- Advanced automation and integration with existing factory operations.
- Compliance with industrial safety and quality standards.
Problem
The factory faced challenges with outdated equipment that limited production capacity and efficiency. The existing systems were unable to meet the growing demand and presented frequent maintenance issues, increasing downtime and costs.
Solution
A new high-speed canning line was designed and installed to meet the factory’s needs. The solution incorporated modern automation systems, ensuring seamless integration with existing processes while significantly enhancing production speed and quality.
Process
The implementation of the project was conducted in carefully structured phases:
- Comprehensive assessment of existing infrastructure and production needs.
- Design and customization of the Can Line Cosemi system to fit factory specifications.
- Procurement and installation of state-of-the-art machinery and control systems.
- Testing, calibration, and commissioning to ensure optimal performance and reliability.