HAYAT, Installation, KHS LINE, 28000 B/H BISKRA, Algeria- 2025
In 2025, SAADA TECHNOLOGIE carried out the installation of a KHS bottling line with a capacity of 28,000 bottles per hour for SARL RAWI, the HAYAT brand in Biskra, Algeria.
LA BELLE, INSTALLATION, CFT LINE, KHEMIS EL KHECHNA, ALGERIA – 2024
In 2024, SAADA TECHNOLOGIE carried out the installation of a CFT line for LA BELLE in Khemis El Khechna, Algeria. This line was used for the production of conserves products.
ARWA, INSTALLATION, PET LINE 5L, SMI LINE, SÉTIF, ALGERIA– 2023
In 2023, SAADA TECHNOLOGIE completed the installation of a 5L PET SMI line at the JUS LA BELLE company in Sétif, Algeria.
QNIAA, INSTALLATION, PET line and SYRUP ROOM, 24,000 B/h Krones, AKBOU BEJAIA, Algeria– 2019
In 2019, SAADA TECHNOLOGIE carried out the installation of a 24,000 B/h PET line from Krones at QNIAA in Akbou, Béjaïa, Algeria. The project also included the installation of the syrup room (mechanical work, electrical work, piping work).
Arwa, Installation, Can Line Krones, 40000c/h, Setif, Algeria – 2019
The installation of the Krones Can Line at Arwa in Setif, Algeria, was completed in 2019. The canning line, capable of processing 40,000 cans per hour.
Manbaa, Installation can line Krones, 28000c/h, Biskra, Algeria – 2018
The installation of the Krones Can Line at Manbaa in Biskra, Algeria, was successfully completed in 2018. This project delivered a Krones production line with a capacity of 28,000 cans per hour.
NCA, Installation can line Krones, 32000 c/h, Rouiba, Algeria – 2018
The installation of the Krones Can Line at NCA in Rouiba, Algeria, was successfully completed in 2018. This project introduced a high-capacity production line with a speed of 32,000 cans per hour.
Ifri, Installation, Can line Krones, 4500c/h, Akbou Béjaia, Algeria – 2016
The installation of the Krones Can Line at Ifri in Akbou, Béjaia, Algeria, was successfully completed in 2016. This project introduced a production line with a capacity of 4,500 cans per hour.
Coca-Cola, Installation, Can Line Krones, 60000 c/h, Rouiba, Algeria – 2016
In 2016, we successfully completed the installation of the Krones Can Line at Coca-Cola in Rouiba, Algeria. This project delivered a Krones production line with a capacity of 60,000 cans per hour.








