ARWA, Relocation, CAN line, 24,000 C/h Krones, Sétif, Algeria– 2022
In 2022, we successfully completed the relocation of a 24,000 C/h KRONES can line for ARWA in Sétif, Algeria. The project involved the full transfer and reinstallation of the line, carried out with strict adherence to safety, quality, and operational efficiency standards.
N’GAOUS, RELOCATION, SIDEL PET LINE, KHEMIS EL KHECHNA, ALGERIA – 2018
In 2018, SAADA TECHNOLOGIE completed successully the relocation of a SIDEL PET line of N’Gaous brand in Khemis El Khechna, Algeria.
Aquafina, Relocation, PET line, 45,000 b/h ,Krones, Lebanon – 2022
In 2022, we successfully participated in the transfer of an Aquafina production line in Lebanon. This complex project involved relocating and reinstalling the entire production line while maintaining strict standards for operational efficiency, safety, and quality. The project was completed with minimal downtime, ensuring a seamless transition and continuous production capability for Aquafina.


